|

Mounting the BMS, Fuse Box and Breaker

Now for the fun part. I started to play around with suitable positions of the BMS, Fusebox and Breaker (shunt trip).

I used DIN rail to mount the Batrium BMS
This 250amp fuse box needed M8 self taping bolts to secure
Fuse box is now connected to Circuit Breaker (shunt trip)

I am using 70mm welding cable I obtained from Metalland and terminating with Cabec 70-8 cable lugs and covering with heat shrink.

Leave a Reply

Your email address will not be published. Required fields are marked *