Today I temporarily connected the MultiPlus II to the Sub Board in my shed (Phase L1) with 6mm electrical cable and turned it on. The inverter came to life and started supplementing my usage perfectly as it should. Below is a screen shot of what my Enphase graph looks like with the battery.. The consumption…

Testing Results
Specs and Tech info

Testing Results

I have tested each module and entered the results into an Excel Spreadsheet. This document is a work in progress so will be continually updated. Nissan Leaf Powerwall Test Results Here is an example of the output from the West Mountain Radio software for Module 1: I’ve tested this module three times so far. Test…

The Powerwall Plan
Specs and Tech info

The Powerwall Plan

The Battery The initial battery will consist of 28 Nissan Leaf modules in 7S4P configuration. The Inverter Victron Multipass II 48V – I’m unsure as yet thou if it will be the 3000w or 5000w model. Solar System My existing Enphase Microinverter system will be used and AC Coupled to the Multiplus II inverter. The…